java-change-with-tests
When to use
- Any Java change that must be merged safely (feature/refactor/bugfix).
Inputs to request (if missing)
Acceptance criteria (1-3 bullets).
Module name (if multi-module repo).
Build tool and test conventions.
Whether integration tests are required for the change.
Steps
Repo map (brief): identify the module, entrypoint, and test location.
Plan: smallest diff that meets acceptance criteria.
Implement: minimal edits.
Tests:
- prefer fast unit tests first
- add integration tests only when required to validate behavior
Verify:
- run targeted tests
- run
mvn -q test(or module-scoped equivalent)
Output PR-ready summary with evidence.
Verification commands (project-specific)
Use the repo's build tool and record the exact commands and results.
Prefer targeted unit tests before full test suites.
Output contract
1) Plan (3-6 steps) 2) Files changed + intent 3) Commands run + results 4) Risks + follow-ups